Pace Digitek Wins ₹494 Cr NTPC Order for BESS Project

NSE

pacedigitk

BSE

544550

Pace Digitek Limited has received a Letter of Acceptance (LoA) from NTPC for execution of a Battery Energy Storage System (BESS) EPC project, valued at ₹494.54 crore. The order includes supply, installation, and long-term maintenance.

PRICE-SENSITIVE TRIGGER

Event: Receipt of LoA from NTPC

Type: EPC Order Win (BESS Project)

Impact: Positive

Immediate Effect: Strengthens order book and expands presence in energy storage segment

Client

NTPC Limited

Scope

Supply, installation, commissioning + AMC

Order Value

₹494.54 crore (excluding GST)

Project Type

BESS EPC + Maintenance

What Happened ?

Pace Digitek has received a Letter of Acceptance from NTPC for executing a Battery Energy Storage System (BESS) project at Nabinagar Super Thermal Power Station.

The contract includes end-to-end EPC execution along with long-term maintenance services.

Contract Scope & Details
  • Supply of BESS systems
  • EPC execution (design, installation, commissioning)
  • Comprehensive Annual Maintenance (full lifecycle)
  • Logistics, insurance, testing, and training included

Insight: AMC component provides recurring revenue beyond project execution

Management commentary
  • Strengthens presence in renewable energy storage segment
  • Expands EPC capabilities in BESS
  • Aligns with India’s energy transition initiatives
Risk Analysis

Key Risks

  • Execution complexity in BESS projects
  • Technology performance risks
  • Dependence on NTPC (PSU exposure)
  • Margin pressure in EPC contracts

Worst Case Scenario

Execution delays or performance issues impacting profitability

Risk Level: Medium

Official Exchange Filing: Pace Digitek Limited

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top