BHEL Receives ₹13,500+ Cr Order from NTPC for 3×800 MW Telangana Project

NSE

BHEL

BSE

500103

Bharat Heavy Electricals Limited (BHEL) has received a Notification of Award (NOA) from NTPC for the main plant package of a 3×800 MW Telangana Stage-II thermal power project, valued at over ₹13,500 crore. This order significantly strengthens BHEL’s order book and execution pipeline.

PRICE-SENSITIVE TRIGGER

Event: Receipt of Notification of Award (NOA) from NTPC

Type: Large Order Win / EPC Contract

Impact: Positive

Immediate Effect: Boosts order book visibility and long-term revenue pipeline

Execution Timeline

62 months

Client

NTPC Limited (Domestic PSU)

Order Value

₹13,500+ crore (excluding GST)

Project Size

3×800 MW (2400 MW total)

What Happened ?

BHEL has received a Notification of Award (NOA) from NTPC for executing the main plant package of the Telangana Stage-II supercritical thermal power project.

The company had earlier emerged as the successful bidder, and with this NOA, the project now moves into the execution phase.

Contract Scope & Details
  • Design and engineering
  • Manufacturing and supply
  • Erection and commissioning
  • Testing of Boiler, Turbine & Generator (BTG package)
  • Civil and structural works included

Insight: Full EPC scope ensures higher revenue capture but also execution responsibility

Management commentary
  • BHEL emerged as successful bidder earlier (Oct 2024)
  • Limited Notice to Proceed already received (Nov 2024)
  • Project strengthens presence in thermal power EPC segment
  • Alignment with NTPC ensures strong order credibility
Risk Analysis

Key Risks

  • Long execution cycle (62 months) → delays possible
  • Margin pressure in EPC contracts
  • Working capital intensity
  • PSU-related payment cycles

Worst Case Scenario

Execution delays or cost overruns impacting profitability

Risk Level: Medium

Official Exchange Filing: Click Me

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top